Top

How can you edit a reporting schedule in Enterprise Insights

Prev Next

Whatfix enables you to edit a reporting schedule after creating it. Edit an existing reporting schedule when it expires or to add or remove a recipient.

Make the following changes to an existing Schedule:

  • Update the name of the schedule

  • Add or remove recipients

  • Change the scheduling condition

Note

Currently, Whatfix enables you to schedule only Trend Insight reports.

Use the following steps to edit a reporting schedule:

  1. On the Enterprise Insights dashboard, click Insights.
    ecc_ia_insights
  1. Click the Trend Insight for which you want to edit the Schedule.

    trend_insight_ei_click_trend_insight_to_schedule.png

  2. Click Schedule.

    ei_click_schedule

  3. Click the existing Schedule.

    click_existing_schedule

  4. Make the necessary changes. For more information, see Schedule a Trend Insight report in EI.

  5. Click Save schedule.

    ei_save_schedule

Info:

  • The schedule gets updated and the reports are sent according to the updated schedule.

  • Once you save the schedule, it becomes active by default and is denoted by the Active label. The reports are sent from the time the schedule becomes active.

    active_report_schedule

Privacy Policy | Whatfix Glossary | Whatfix Platform Status
Copyright © 2024 WHATFIX TM. All rights reserved.