Top
How can you edit a reporting Schedule in Product Analytics?
  • 16 Aug 2024
  • 1 Minute To Read
  • Dark
    Light
  • PDF

How can you edit a reporting Schedule in Product Analytics?

  • Dark
    Light
  • PDF

Article summary

Whatfix enables you to edit a reporting schedule after creating it. You may want to edit an existing reporting Schedule when it expires or if you want to add or remove a recipient.

Make the following changes to an existing Schedule:

  • Update the name of the Schedule

  • Add or remove recipients

  • Change the scheduling condition

Your title goes here

Currently, Whatfix enables you to schedule only Trend Insight reports.

Use the following steps to edit a reporting Schedule:

  1. On the Whatfix Analytics dashboard, click Insights.
    ia_left%20nav_insights
  1. Click the Trend Insight for which you want to edit the Schedule.

    select_trend_insight_to_schedule
  2. Click Schedule.

    ei_click_schedule
  3. Click the existing Schedule.

    click_existing_schedule
  4. Make the necessary changes. For more information, see Schedule a Trend Insight.

  5. Click Save schedule.

    ei_save_schedule

Your title goes here

  • The Schedule gets updated, and the reports are sent as per the updated Schedule.

  • Once the Schedule is saved, it is made active by default and denoted by the Active label. The reports are sent from the time the Schedule becomes active.

    active_report_schedule


Was this article helpful?

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.